Hadera Bridge
Hadera Bridge
Israel, Hadera
infrastructures
Completed
Advanced Solutions for a Complex Infrastructure Project
As part of the expansion of Highway 2 between the Olga and Caesarea interchanges, two existing road bridges were dismantled and replaced with the planning and construction of two new bridges spanning the Hadera River, along with an arched pedestrian and bicycle bridge.
As part of the project, BG Bond supplied 1,523 finishing, waterproofing, and paint products—including specialized acrylic adhesives, coating and sealing materials, decorative finishes, and concrete repair solutions. The company also provided advanced protective paints designed to ensure long-term corrosion resistance.






